Tap Navarro - Limestone substation interconnection queue
2 active projects totalling 203.3 MW in the ERCOT queue.
2active projects
203.3active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 24INR0086 | Pisgah Ridge Solar 2 | 345 | 101.9 | Solar | SS Completed, FIS Started, No IA |
| 24INR0087 | Pisgah Ridge Storage 3 | 345 | 101.4 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.