Tap Navarro - Limestone substation interconnection queue

2 active projects totalling 203.3 MW in the ERCOT queue.

2active projects
203.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
24INR0086 Pisgah Ridge Solar 2 345 101.9 Solar SS Completed, FIS Started, No IA
24INR0087 Pisgah Ridge Storage 3 345 101.4 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.