Substation Scout

Tap Nimbus () – Big Onion () & Stainback () – Elrod Switch () DCKT substation interconnection queue

2 active projects totalling 918.9 MW in the ERCOT queue.

2active projects
918.9active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0264 Victory Ellis – Gas 345 465.9 Gas SS Completed, FIS Started, No IA
28INR0529 Victory Ellis–BESS 345 453 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.