Tap # Big Onion - # Navarro substation interconnection queue

2 active projects totaling 304.5 MW in the ERCOT queue.

2 ERCOT queue filings name Tap # Big Onion - # Navarro as the point of interconnection, all in Navarro County, TX.

Target commercial operation date as filed: Mar 2028 (2 filings). 2 active filings target a date after November 27, 2026.

Interconnecting entity as filed: Glasgow Solar LLC (2 filings).

2active projects
304.5active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
24INR0206 Glasgow Solar 345 203.5 Solar SS Completed, FIS Started, IA Mar 2028
24INR0207 Glasgow Storage 345 101 Battery SS Completed, FIS Started, IA Mar 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.

Other ERCOT queue substations in Navarro County, TX

All 29 ERCOT queue filings in Navarro County, TX.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first