Two Step Solar

ERCOT queue ID 29INR0196

Two Step Solar (29INR0196) is listed in the ERCOT interconnection queue as a 401.6 MW solar project in Ellis County, TX. The filing names Tap Venus - Navarro as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 17, 2029. It records the screening study as complete on February 4, 2026.

Queue ID29INR0196
Project nameTwo Step Solar
Status (as published)SS Completed, FIS Started, No IA
SubstationTap Venus - Navarro
Point of interconnectionTap 345kV 1907 Venus - 68091 Navarro
CountyEllis
StateTX
Voltage345 kV
Capacity401.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2029-09-17
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap Venus - Navarro substation: 2 requests in the ERCOT queue, 2 active totaling 663.6 MW.

Queue IDProjectMWResourceStatus
25INR0018Yellow Cat Wind262WindSS Completed, FIS Completed, IA

Ellis, TX: 30 requests in the ERCOT queue, 26 active totaling 5,761.2 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityTwo Step Solar, LLC
CDR reporting zoneNORTH
Fuel codeSOL
Technology codePV
Screening study complete2026-02-04
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.