Two Step Solar
ERCOT queue ID 29INR0196
Two Step Solar (29INR0196) is listed in the ERCOT interconnection queue as a 401.6 MW solar project in Ellis County, TX. The filing names Tap Venus - Navarro as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 17, 2029. It records the screening study as complete on February 4, 2026.
| Queue ID | 29INR0196 |
|---|---|
| Project name | Two Step Solar |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap Venus - Navarro |
| Point of interconnection | Tap 345kV 1907 Venus - 68091 Navarro |
| County | Ellis |
| State | TX |
| Voltage | 345 kV |
| Capacity | 401.6 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-09-17 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Venus - Navarro substation: 2 requests in the ERCOT queue, 2 active totaling 663.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 25INR0018 | Yellow Cat Wind | 262 | Wind | SS Completed, FIS Completed, IA |
Ellis, TX: 30 requests in the ERCOT queue, 26 active totaling 5,761.2 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Two Step Solar, LLC |
|---|---|
| CDR reporting zone | NORTH |
| Fuel code | SOL |
| Technology code | PV |
| Screening study complete | 2026-02-04 |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.