Substation Scout

Bastrop, TX interconnection queue

15 active projects totalling 5,239.1 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

15active projects
5,239.1active MW
16total filed
Queue IDProjectkVMWResourceStatus
26INR0261 Bastrop Peaking Generators (TEF-Due Diligence) 345 1,104 Gas SS Completed, FIS Started, IA
30INR0051 Sim Gideon Combined Cycle 138 880 Gas SS Completed, FIS Started, IA
30INR0052 Lost Pines Power Park 345 880 Gas SS Completed, FIS Started, IA
26INR0560 Fort Worth Power Core Bastrop Gas Plant 345 506.4 Gas SS Completed, FIS Started, No IA
26INR0045 LUND STORAGE CENTER 1 138 407.6 Battery SS Completed, FIS Started, No IA
31INR0011 SIM GIDEON GAS RICE 138 226 Gas SS Completed, FIS Started, IA
21INR0413 Big Star Solar 345 203.1 Solar SS Completed, FIS Completed, IA
26INR0514 Techne BESS 138 202.7 Battery SS Completed, FIS Started, No IA
25INR0422 Waterloo Solar 1 n/r 200.6 Solar SS Completed, FIS Started, IA
27INR0090 Antonio Road BESS 138 155.5 Battery SS Completed, FIS Started, No IA
29INR0166 LOST PINES GAS RECIP 345 113 Gas SS Completed, FIS Started, IA
31INR0010 LOST PINES GAS RECIP PHASE 2 345 113 Gas SS Completed, FIS Started, IA
25INR0447 Waterloo BESS 1 n/r 105.6 Battery SS Completed, FIS Started, IA
25INR0073 Saltillo Storage n/r 101 Battery Inactive
21INR0469 Big Star Storage 345 80 Battery SS Completed, FIS Completed, IA
26INR0511 Little Star Solar 345 61.6 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.