Bastrop, TX interconnection queue
15 active projects totalling 5,239.1 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).
15active projects
5,239.1active MW
16total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 26INR0261 | Bastrop Peaking Generators (TEF-Due Diligence) | 345 | 1,104 | Gas | SS Completed, FIS Started, IA |
| 30INR0051 | Sim Gideon Combined Cycle | 138 | 880 | Gas | SS Completed, FIS Started, IA |
| 30INR0052 | Lost Pines Power Park | 345 | 880 | Gas | SS Completed, FIS Started, IA |
| 26INR0560 | Fort Worth Power Core Bastrop Gas Plant | 345 | 506.4 | Gas | SS Completed, FIS Started, No IA |
| 26INR0045 | LUND STORAGE CENTER 1 | 138 | 407.6 | Battery | SS Completed, FIS Started, No IA |
| 31INR0011 | SIM GIDEON GAS RICE | 138 | 226 | Gas | SS Completed, FIS Started, IA |
| 21INR0413 | Big Star Solar | 345 | 203.1 | Solar | SS Completed, FIS Completed, IA |
| 26INR0514 | Techne BESS | 138 | 202.7 | Battery | SS Completed, FIS Started, No IA |
| 25INR0422 | Waterloo Solar 1 | n/r | 200.6 | Solar | SS Completed, FIS Started, IA |
| 27INR0090 | Antonio Road BESS | 138 | 155.5 | Battery | SS Completed, FIS Started, No IA |
| 29INR0166 | LOST PINES GAS RECIP | 345 | 113 | Gas | SS Completed, FIS Started, IA |
| 31INR0010 | LOST PINES GAS RECIP PHASE 2 | 345 | 113 | Gas | SS Completed, FIS Started, IA |
| 25INR0447 | Waterloo BESS 1 | n/r | 105.6 | Battery | SS Completed, FIS Started, IA |
| 25INR0073 | Saltillo Storage | n/r | 101 | Battery | Inactive |
| 21INR0469 | Big Star Storage | 345 | 80 | Battery | SS Completed, FIS Completed, IA |
| 26INR0511 | Little Star Solar | 345 | 61.6 | Solar | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.