Little Star Solar

ERCOT queue ID 26INR0511

Little Star Solar (26INR0511) is listed in the ERCOT interconnection queue as a 61.6 MW solar project in Bastrop County, TX. The filing names # CISTERN as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2027. It records the screening study as complete on September 23, 2024.

Queue ID26INR0511
Project nameLittle Star Solar
Status (as published)SS Completed, FIS Started, No IA
Substation# CISTERN
Point of interconnection#9043 CISTERN 345kV
CountyBastrop
StateTX
Voltage345 kV
Capacity61.6 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityRWE Clean Energy Development, LLC
CDR reporting zoneSOUTH
Fuel codeSOL
Technology codePV
Screening study complete2024-09-23
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.