Techne BESS

ERCOT queue ID 26INR0514

Techne BESS (26INR0514) is listed in the ERCOT interconnection queue as a 202.7 MW battery project in Bastrop County, TX. The filing names RED ROCK as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of December 31, 2028. It records the screening study as complete on December 8, 2024.

Queue ID26INR0514
Project nameTechne BESS
Status (as published)SS Completed, FIS Started, No IA
SubstationRED ROCK
Point of interconnection7560 RED ROCK 138kV
CountyBastrop
StateTX
Voltage138 kV
Capacity202.7 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityTechne BESS, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2024-12-08

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first