SIM GIDEON GAS RICE (31INR0011) is listed in the ERCOT interconnection queue as a 226 MW gas project in Bastrop County, TX. The filing names (#) SIM GIDEON as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of May 10, 2031. It records the screening study as complete on October 26, 2025 and the interconnection agreement as signed on December 19, 2025.

Queue ID31INR0011
Project nameSIM GIDEON GAS RICE
Status (as published)SS Completed, FIS Started, IA
Substation(#) SIM GIDEON
Point of interconnection(#7310) SIM GIDEON 138 kV
CountyBastrop
StateTX
Voltage138 kV
Capacity226 MW
Resource (as published)GAS/IC
Resource categoryGas (normalized for filtering)
Target commercial operation2031-05-10
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

(#) SIM GIDEON substation: 2 requests in the ERCOT queue, 2 active totaling 1,106 MW.

Queue IDProjectMWResourceStatus
30INR0051Sim Gideon Combined Cycle880GasSS Completed, FIS Started, IA

Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityLCRA
CDR reporting zoneSOUTH
Fuel codeGAS
Technology codeIC
Interconnection agreement signed2025-12-19
Screening study complete2025-10-26

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first