Waterloo BESS 1

ERCOT queue ID 25INR0447

Waterloo BESS 1 (25INR0447) is listed in the ERCOT interconnection queue as a 120 MW battery project in Bastrop County, TX. The filing names Tap 345-kV Austrop to Zorn as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 15, 2028. It records the screening study as complete on August 11, 2023 and the interconnection agreement as signed on September 4, 2024.

Queue ID25INR0447
Project nameWaterloo BESS 1
Status (as published)SS Completed, FIS Started, IA
SubstationTap 345-kV Austrop to Zorn
Point of interconnectionTap 345-kV 7040 Austrop to 7042 Zorn
CountyBastrop
StateTX
VoltageNot reported
Capacity120 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Tap 345-kV Austrop to Zorn substation: 2 requests in the ERCOT queue, 2 active totaling 321.3 MW.

Queue IDProjectMWResourceStatus
25INR0422Waterloo Solar 1201.3SolarSS Completed, FIS Completed, IA

Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Capacity revised +14.4 SS Completed, FIS Started, IA → SS Completed, FIS Started, IA

Full change log →

Additional filed fields

Interconnecting entityWaterloo BESS, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Interconnection agreement signed2024-09-04
Screening study complete2023-08-11
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.