LUND STORAGE CENTER 1

ERCOT queue ID 26INR0045

LUND STORAGE CENTER 1 (26INR0045) is listed in the ERCOT interconnection queue as a 407.6 MW battery project in Bastrop County, TX. The filing names TAP LINE AND CREATE NEW BUS BETWEEN KIMBRO AND ELGIN SWITCH as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of October 31, 2029. It records the screening study as complete on April 14, 2023.

Queue ID26INR0045
Project nameLUND STORAGE CENTER 1
Status (as published)SS Completed, FIS Started, No IA
SubstationTAP LINE AND CREATE NEW BUS BETWEEN KIMBRO AND ELGIN SWITCH
Point of interconnectionTAP 138 KV LINE AND CREATE NEW BUS BETWEEN KIMBRO (7337) AND ELGIN SWITCH (3650)
CountyBastrop
StateTX
Voltage138 kV
Capacity407.6 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2029-10-31
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityLund Storage Center 1, LLC
CDR reporting zoneSOUTH
Fuel codeOTH
Technology codeBA
Screening study complete2023-04-14

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.