Bastrop Peaking Generators (TEF-Due Diligence) (26INR0261) is listed in the ERCOT interconnection queue as a 1,104 MW gas project in Bastrop County, TX. The filing names L_GARFIE5_1Y as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of December 7, 2027. It records the screening study as complete on May 1, 2024 and the interconnection agreement as signed on December 19, 2025.

Queue ID26INR0261
Project nameBastrop Peaking Generators (TEF-Due Diligence)
Status (as published)SS Completed, FIS Started, IA
SubstationL_GARFIE5_1Y
Point of interconnection7048 L_GARFIE5_1Y 345kV
CountyBastrop
StateTX
Voltage345 kV
Capacity1,104 MW
Resource (as published)GAS/GT
Resource categoryGas (normalized for filtering)
Target commercial operation2027-12-07
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityMPH Bastrop Peakers, LLC
CDR reporting zoneSOUTH
Fuel codeGAS
Technology codeGT
Interconnection agreement signed2025-12-19
Screening study complete2024-05-01

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first