Fort Worth Power Core Bastrop Gas Plant
ERCOT queue ID 26INR0560
Fort Worth Power Core Bastrop Gas Plant (26INR0560) is listed in the ERCOT interconnection queue as a 506.4 MW gas project in Bastrop County, TX. The filing names Tap ZORN - AUSTROP as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 28, 2029. It records the screening study as complete on August 22, 2025.
| Queue ID | 26INR0560 |
|---|---|
| Project name | Fort Worth Power Core Bastrop Gas Plant |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap ZORN - AUSTROP |
| Point of interconnection | Tap 345kV 7042 ZORN - 7040 AUSTROP |
| County | Bastrop |
| State | TX |
| Voltage | 345 kV |
| Capacity | 506.4 MW |
| Resource (as published) | GAS/CC |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2029-09-28 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | Fort Worth Power Core LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | GAS |
| Technology code | CC |
| Screening study complete | 2025-08-22 |
| Air permit | 2024-12-20 |
| Water availability | 2025-11-19 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.