Big Star Storage
ERCOT queue ID 21INR0469
Big Star Storage (21INR0469) is listed in the ERCOT interconnection queue as a 80 MW battery project in Bastrop County, TX. The filing names Tap Lytton - Holman as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Completed, IA”, with a target commercial operation date of September 25, 2026. It records the screening study as complete on March 26, 2020, the full interconnection study as approved on July 19, 2021 and the interconnection agreement as signed on October 2, 2020.
| Queue ID | 21INR0469 |
|---|---|
| Project name | Big Star Storage |
| Status (as published) | SS Completed, FIS Completed, IA |
| Substation | Tap Lytton - Holman |
| Point of interconnection | Tap 345kV 9074 Lytton - 9073 Holman |
| County | Bastrop |
| State | TX |
| Voltage | 345 kV |
| Capacity | 80 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-09-25 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Tap Lytton - Holman substation: 2 requests in the ERCOT queue, 2 active totaling 283.1 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 21INR0413 | Big Star Solar | 203.1 | Solar | SS Completed, FIS Completed, IA |
Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | RWE Solar Development, LLC |
|---|---|
| CDR reporting zone | SOUTH |
| Fuel code | OTH |
| Technology code | BA |
| Interconnection agreement signed | 2020-10-02 |
| Screening study complete | 2020-03-26 |
| Full interconnection study approved | 2021-07-19 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.