Substation Scout

Lost Pines Power Park

ERCOT queue ID 30INR0052

Lost Pines Power Park (30INR0052) is listed in the ERCOT interconnection queue as a 880 MW gas project in Bastrop County, TX. The filing names (#) LOST PINES as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of June 1, 2033. It records the screening study as complete on September 17, 2025 and the interconnection agreement as signed on December 26, 2025.

Queue ID30INR0052
Project nameLost Pines Power Park
Status (as published)SS Completed, FIS Started, IA
Substation(#) LOST PINES
Point of interconnection(#170174) LOST PINES 345 kV
CountyBastrop
StateTX
Voltage345 kV
Capacity880 MW
Resource (as published)GAS/CC
Resource categoryGas (normalized for filtering)
Target commercial operation2033-06-01
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

(#) LOST PINES substation: 3 requests in the ERCOT queue, 3 active totaling 1,106 MW.

Queue IDProjectMWResourceStatus
29INR0166LOST PINES GAS RECIP113GasSS Completed, FIS Started, IA
31INR0010LOST PINES GAS RECIP PHASE 2113GasSS Completed, FIS Started, IA

Bastrop, TX: 16 requests in the ERCOT queue, 14 active totaling 5,098.7 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityLCRA
CDR reporting zoneSOUTH
Fuel codeGAS
Technology codeCC
Interconnection agreement signed2025-12-26
Screening study complete2025-09-17

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first