LaPine Substation substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 8 with terminal status (shown greyed).

0active projects
0active MW
8total filed
Queue IDProjectkVMWResourceStatus
G0875 Not reported n/r 500 Solar WITHDRAWN
G0909 Not reported n/r 200 Solar WITHDRAWN
G0910 Not reported n/r 200 Solar WITHDRAWN
G0911 Not reported 230 200 Solar WITHDRAWN
G0912 Not reported 230 200 Solar WITHDRAWN
G0913 Not reported 230 200 Solar WITHDRAWN
G73 OR-CAL Power n/r 97 Other WITHDRAWN
G0762 Not reported n/r 3 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.