Fort Rock Substation substation interconnection queue

1 active project totalling 105 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
105active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0527 Not reported n/r 105 Solar STUDY COMPLETED
G0431 Not reported n/r 20 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.