Midstate Electric distribution system substation interconnection queue

2 active projects totalling 5 MW in the BPA queue, plus 2 with terminal status (shown greyed).

2active projects
5active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0376 Not reported 24.9 4 Solar WITHDRAWN
G0377 Outback 24.9 4 Solar ENERGIZED
G0379 Not reported 24.9 4 Solar WITHDRAWN
G0433 Outback 24.9 1 Solar ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.