Captain Jack Substation substation interconnection queue
0 active projects totalling 0 MW in the BPA queue, plus 6 with terminal status (shown greyed).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0748 | Not reported | 500 | 1,403 | Solar | WITHDRAWN |
| G0501 | Not reported | 500 | 1,100 | Gas | WITHDRAWN |
| G0648 | Not reported | 500 | 1,100 | Battery | WITHDRAWN |
| G0870 | Not reported | n/r | 500 | Wind | WITHDRAWN |
| G0871 | Not reported | n/r | 500 | Wind | WITHDRAWN |
| G33 | Tenaska Inc | 500 | 450 | Gas | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.