Captain Jack Substation substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
G0748 Not reported 500 1,403 Solar WITHDRAWN
G0501 Not reported 500 1,100 Gas WITHDRAWN
G0648 Not reported 500 1,100 Battery WITHDRAWN
G0870 Not reported n/r 500 Wind WITHDRAWN
G0871 Not reported n/r 500 Wind WITHDRAWN
G33 Tenaska Inc 500 450 Gas WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.