Tap off BPA's line within 10 miles of Midstate Electric's Fort Rock Substation. substation interconnection queue

2 active projects totalling 40 MW in the BPA queue.

2active projects
40active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0570 Not reported 115 20 Solar STUDY COMPLETED
G0571 Not reported 115 20 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.