Deschutes, OR interconnection queue

7 active projects totalling 873.9 MW in the BPA queue, plus 19 with terminal status (shown greyed).

7active projects
873.9active MW
26total filed
Queue IDProjectkVMWResourceStatus
G1051 Not reported 230 1,300 Solar WITHDRAWN
G1052 Not reported 230 1,300 Solar WITHDRAWN
G1050 Not reported 230 650 Solar WITHDRAWN
G1056 Not reported 230 650 Battery WITHDRAWN
G91 Duke Energy NA 230 640 Gas WITHDRAWN
G0539 Ponderosa Project n/r 600 Solar ENERGIZED
G0861 Not reported 500 500 Wind WITHDRAWN
G0662 Not reported 230 400 Solar WITHDRAWN
G1096 Not reported 230 216 Other RECEIVED
G0909 Not reported n/r 200 Solar WITHDRAWN
G0910 Not reported n/r 200 Solar WITHDRAWN
G0912 Not reported 230 200 Solar WITHDRAWN
G0929 Not reported 230 150 Solar WITHDRAWN
G0214 Not reported 230 140 Other WITHDRAWN
G73 OR-CAL Power n/r 97 Other WITHDRAWN
G0541 Not reported 115 64 Solar WITHDRAWN
G0984 Not reported n/r 60 Solar WITHDRAWN
G1078 Not reported n/r 54 Other RECEIVED
G0510 Not reported 115 40 Solar WITHDRAWN
G0477 Not reported 230 38 Other WITHDRAWN
G0394 Not reported n/r 28 Other WITHDRAWN
G0466 Sisters Irrigation Hydro Project n/r 1 Hydro ENERGIZED
G0574 McKenzie Reservoir Hydroelectric Facility n/r 1 Hydro ENERGIZED
G0859 Not reported 12.5 1 Solar WITHDRAWN
G1093 Not reported 230 1 Solar CONST AGRMT EXE
G1071 Not reported 12.5 0.9 Solar CONST AGRMT EXE

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.