Ponderosa Substation substation interconnection queue

2 active projects totalling 700 MW in the BPA queue, plus 11 with terminal status (shown greyed).

2active projects
700active MW
13total filed
Queue IDProjectkVMWResourceStatus
G0695 Not reported 500 1,200 Battery WITHDRAWN
G0696 Not reported 500 1,200 Solar WITHDRAWN
G0697 Not reported 500 1,200 Solar WITHDRAWN
G0669 Not reported 230 600 Solar STUDY
G0698 Not reported 500 600 Solar WITHDRAWN
G0699 Not reported 500 600 Battery WITHDRAWN
G0700 Not reported 500 600 Solar WITHDRAWN
G0701 Not reported 500 600 Solar WITHDRAWN
G0702 Not reported 500 600 Solar WITHDRAWN
G1023 Not reported n/r 500 Solar WITHDRAWN
G1024 Not reported n/r 500 Solar WITHDRAWN
G0693 Not reported 500 100 Hydro STUDY
G0694 Not reported 500 100 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.