Ponderosa Substation substation interconnection queue
2 active projects totalling 700 MW in the BPA queue, plus 11 with terminal status (shown greyed).
2active projects
700active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0695 | Not reported | 500 | 1,200 | Battery | WITHDRAWN |
| G0696 | Not reported | 500 | 1,200 | Solar | WITHDRAWN |
| G0697 | Not reported | 500 | 1,200 | Solar | WITHDRAWN |
| G0669 | Not reported | 230 | 600 | Solar | STUDY |
| G0698 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0699 | Not reported | 500 | 600 | Battery | WITHDRAWN |
| G0700 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0701 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0702 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G1023 | Not reported | n/r | 500 | Solar | WITHDRAWN |
| G1024 | Not reported | n/r | 500 | Solar | WITHDRAWN |
| G0693 | Not reported | 500 | 100 | Hydro | STUDY |
| G0694 | Not reported | 500 | 100 | Solar | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.