Substation Scout

Grizzly-Summer Lake No 1 line substation interconnection queue

1 active project totalling 400 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
400active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0861 Not reported 500 500 Wind WITHDRAWN
G0651 Not reported 500 400 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.