Ponderosa substation interconnection queue
3 active projects totalling 1,800 MW in the BPA queue, plus 3 with terminal status (shown greyed).
3active projects
1,800active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0642 | Not reported | 230 | 600 | Battery | STUDY |
| G0643 | Not reported | 230 | 600 | Battery | STUDY |
| G0673 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0674 | Not reported | 500 | 600 | Solar | WITHDRAWN |
| G0675 | Not reported | 500 | 600 | Hydro | STUDY |
| G0437 | Not reported | 230 | 30 | Other | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.