2 active projects totalling 370 MW in the BPA queue.

2active projects
370active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0655 Not reported 115 200 Solar STUDY
G0654 Not reported 115 170 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.