Substation Scout

Chief Joseph-Sickler No 1 line substation interconnection queue

2 active projects totalling 600 MW in the BPA queue.

2active projects
600active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0840 Not reported 500 300 Solar STUDY
G0853 Not reported 500 300 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.