1 active project totalling 247 MW in the BPA queue, plus 3 with terminal status (shown greyed).

1active projects
247active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0471 Not reported 230 590 Gas WITHDRAWN
G2 Goldendale Energy Center 230 247 Gas ENERGIZED
G66 100MW Harvalum n/r 100 Wind WITHDRAWN
G56 GNA Energy 230 45 Gas WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.