Substation Scout

Goldendale substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0318 Not reported 115 20 Wind WITHDRAWN
G0319 Not reported 115 20 Wind WITHDRAWN
G0320 Not reported 115 20 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.