Grand Coulee Switchyard substation interconnection queue

1 active project totalling 500 MW in the BPA queue, plus 2 with terminal status (shown greyed).

1active projects
500active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0914 Not reported 500 1,000 Battery WITHDRAWN
G0915 Not reported 500 500 Battery WITHDRAWN
G0916 Not reported 500 500 Battery STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.