Not reported
BPA queue ID G0840
| Queue ID | G0840 |
|---|---|
| Project name | Not reported |
| Status (as published) | STUDY |
| Substation | Chief Joseph-Sickler No 1 line |
| Point of interconnection | Chief Joseph-Sickler No 1 500kV line |
| County | Douglas |
| State | WA |
| Voltage | 500 kV |
| Capacity | 300 MW |
| Resource (as published) | Solar/Photovoltaic |
| Resource category | Solar (normalised for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | bpa-generation |
Tracked changes
No changes to this filing observed since BPA tracking began on September 22, 2026. Full change log →
Additional filed fields
| Connection Type | GI |
|---|---|
| Interconnection Type | NRIS & ERIS |
| Poi | Chief Joseph-Sickler No 1 500kV line |
| Generator Type | Photovoltaic |
| Fuel Source | Solar |
| Nameplate Mw Total | 614.8 |
| Max Summer Mw | 300 |
| Max Winter Mw | 300 |
| Cluster | Transition Cluster |
| Reason Not Completed | . |
| Comments | North1 Study Area |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.