Substation Scout

McNary-John Day No 2 line substation interconnection queue

2 active projects totalling 800 MW in the BPA queue, plus 1 with terminal status (shown greyed).

2active projects
800active MW
3total filed
Queue IDProjectkVMWResourceStatus
G0932 Not reported 500 400 Solar STUDY
G0933 Not reported 500 400 Solar STUDY
G1005 Not reported 500 225 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.