Goldendale Substation substation interconnection queue

2 active projects totalling 2.8 MW in the BPA queue.

2active projects
2.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
G1097 Not reported n/r 1.4 Battery STUDY
G1098 Not reported n/r 1.4 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.