New substation on BPA's McNary-John Day line substation interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0251 Not reported 500 700 Wind WITHDRAWN
G0309 Not reported 500 200 Wind WITHDRAWN
G0336 Not reported 500 200 Wind WITHDRAWN
G0337 Not reported 500 200 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.