Knight Substation substation interconnection queue

2 active projects totalling 571 MW in the BPA queue, plus 3 with terminal status (shown greyed).

2active projects
571active MW
5total filed
Queue IDProjectkVMWResourceStatus
G0846 Not reported n/r 500 Solar WITHDRAWN
G0876 Not reported n/r 500 Wind WITHDRAWN
G0589 Not reported 500 381 Solar STUDY COMPLETED
G0637 Not reported 500 190 Battery STUDY COMPLETED
G0638 Not reported 500 190 Battery WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.