Substation Scout

Jefferson, PA interconnection queue

3 active projects totalling 79.2 MW in the PJM queue, plus 8 with terminal status (shown greyed).

3active projects
79.2active MW
11total filed
Queue IDProjectkVMWResourceStatus
AI1-212 Homer City - Stolle Road 345 kV 345 182 Hybrid Withdrawn
AA1-087 Timblin-Trade City 115kV 115 100 Not reported Withdrawn
AE2-316 Squab Solar 138 41.2 Solar Under Construction
AD1-154 Timblin 34.5 kV 34.5 20 Gas Withdrawn
C01-1845 Timblin 34.5 kV 34.5 20 Gas Active
AF1-302 Squab Solar 138 18 Solar Under Construction
AG1-206 Snyder Twp 34.5 kV 34.5 6.5 Solar Withdrawn
AG1-296 Snyder Township 34.5 kV 34.5 6.5 Solar Withdrawn
AH2-356 Brookeville 34.5 kV 34.5 6.4 Solar Withdrawn
AH2-066 Jefferson 12.5 kV 12.5 3.3 Solar Withdrawn
AH2-024 Kodiak Solar 13.2 kV 13.2 2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.