Substation Scout

Timblin 34.5 kV

PJM queue ID C01-1845

Timblin 34.5 kV (C01-1845) is listed in the PJM interconnection queue as a 20 MW gas project in Jefferson County, PA. The filing names Timblin as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 1, 2027.

Queue IDC01-1845
Project nameTimblin 34.5 kV
Status (as published)Active
SubstationTimblin
Point of interconnectionTimblin 34.5 kV
CountyJefferson
StatePA
Voltage34.5 kV
Capacity20 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2027-04-01
Source datasetcycle

Same substation and county

Timblin substation: 3 requests in the PJM queue, 1 active totaling 20 MW.

Queue IDProjectMWResourceStatus
AD1-154Timblin 34.5 kV20GasWithdrawn
AF1-240AR-PIERCE11SolarWithdrawn

Jefferson, PA: 11 requests in the PJM queue, 3 active totaling 79.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperKeystone Agripower, Inc.
Transmission ownerPENELEC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy20.0
MW capacity20.0
MFO20.0
Submitted date4/27/2026
Last updated6/12/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first