Brookville-Squab Hollow substation interconnection queue
2 active projects totaling 59.2 MW in the PJM queue.
2 PJM queue filings name Brookville-Squab Hollow as the point of interconnection, all in Jefferson County, PA.
Target commercial operation dates as filed run from Jul 2027 to Dec 2027 (2 filings). 2 active filings target a date after November 27, 2026.
2active projects
59.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-316 | Squab Solar | 138 | 41.2 | Solar | Under Construction | Jul 2027 |
| AF1-302 | Squab Solar | 138 | 18 | Solar | Under Construction | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.