Surry 230 kV
PJM queue ID C01-1118
Surry 230 kV (C01-1118) is listed in the PJM interconnection queue as a 75 MW battery project in Surry County, VA. The filing names Surry as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 23, 2027.
| Queue ID | C01-1118 |
|---|---|
| Project name | Surry 230 kV |
| Status (as published) | Active |
| Substation | Surry |
| Point of interconnection | Surry 230 kV |
| County | Surry |
| State | VA |
| Voltage | 230 kV |
| Capacity | 75 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2027-03-23 |
| Source dataset | cycle |
Same substation and county
Surry substation: 10 requests in the PJM queue, 10 active totaling 336.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| S114 | Surry Power Station - Units 1 & 2 | 75 | Nuclear | In Service |
| S115 | Surry Power Station - Units 1 & 2 | 75 | Nuclear | In Service |
| S82 | Gravel Neck Gas Turbine #3 | 19 | Gas | In Service |
| S83 | Gravel Neck Gas Turbine #4 | 19 | Gas | In Service |
| S84 | Gravel Neck Gas Turbine #5 | 19 | Gas | In Service |
| S85 | Gravel Neck Gas Turbine #6 | 19 | Gas | In Service |
| S111 | Surry Power Station - Units 1 & 2 | 15 | Nuclear | In Service |
| S113 | Surry Power Station - Units 1 & 2 | 15 | Nuclear | In Service |
| C01-1162 | Surry 230 kV | 5.7 | Nuclear | Active |
Surry, VA: 43 requests in the PJM queue, 16 active totaling 1,016.5 MW.
A substation with the same name is named in PJM transmission planning materials: Surry (DOM, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 150.0 |
| MW capacity | 75.0 |
| MFO | 150.0 |
| Submitted date | 4/23/2026 |
| Last updated | 5/13/2026 |