Gravel Neck Gas Turbine #5 (S84) is listed in the PJM interconnection queue as a 19 MW gas project in Surry County, VA. The filing names Surry as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 6, 2010.

Queue IDS84
Project nameGravel Neck Gas Turbine #5
Status (as published)In Service
SubstationSurry
Point of interconnectionSurry 230kV
CountySurry
StateVA
Voltage230 kV
Capacity19 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2010-05-06
Source datasetserial

Same substation and county

Surry substation: 10 requests in the PJM queue, 10 active totaling 336.7 MW.

Queue IDProjectMWResourceStatus
C01-1118Surry 230 kV75BatteryActive
S114Surry Power Station - Units 1 & 275NuclearIn Service
S115Surry Power Station - Units 1 & 275NuclearIn Service
S82Gravel Neck Gas Turbine #319GasIn Service
S83Gravel Neck Gas Turbine #419GasIn Service
S85Gravel Neck Gas Turbine #619GasIn Service
S111Surry Power Station - Units 1 & 215NuclearIn Service
S113Surry Power Station - Units 1 & 215NuclearIn Service
C01-1162Surry 230 kV5.7NuclearActive

Surry, VA: 43 requests in the PJM queue, 16 active totaling 1,016.5 MW.

A substation with the same name is named in PJM transmission planning materials: Surry (DOM, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy19
MW capacity19
MFO92

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first