Surry 230 kV

PJM queue ID C01-1162

Surry 230 kV (C01-1162) is listed in the PJM interconnection queue as a 5.7 MW nuclear project in Surry County, VA. The filing names Surry as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 30, 2028.

Queue IDC01-1162
Project nameSurry 230 kV
Status (as published)Active
SubstationSurry
Point of interconnectionSurry 230 kV
CountySurry
StateVA
Voltage230 kV
Capacity5.7 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Target commercial operation2028-06-30
Source datasetcycle

Same substation and county

Surry substation: 10 requests in the PJM queue, 10 active totaling 336.7 MW.

Queue IDProjectMWResourceStatus
C01-1118Surry 230 kV75BatteryActive
S114Surry Power Station - Units 1 & 275NuclearIn Service
S115Surry Power Station - Units 1 & 275NuclearIn Service
S82Gravel Neck Gas Turbine #319GasIn Service
S83Gravel Neck Gas Turbine #419GasIn Service
S84Gravel Neck Gas Turbine #519GasIn Service
S85Gravel Neck Gas Turbine #619GasIn Service
S111Surry Power Station - Units 1 & 215NuclearIn Service
S113Surry Power Station - Units 1 & 215NuclearIn Service

Surry, VA: 43 requests in the PJM queue, 16 active totaling 1,016.5 MW.

A substation with the same name is named in PJM transmission planning materials: Surry (DOM, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)
Transmission ownerDominion
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity5.7
MFO932.0
Submitted date4/27/2026
Last updated5/8/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first