Substation Scout

Reynolds Substation substation interconnection queue

6 active projects totaling 1,400.2 MW in the MISO queue, plus 1 with terminal status (shown grayed).

7 MISO queue filings name Reynolds Substation as the point of interconnection, all in IN.

6active projects
1,400.2active MW
7total filed
Queue IDProjectkVMWResourceStatus
J2496 Not reported 345 400 Battery Active
J837 Not reported 345 200.1 Wind Operational
J838 Not reported 345 200.1 Wind Operational
G864 Not reported n/r 200 Wind Withdrawn
J1069 Not reported 345 200 Wind Active
J913 Not reported 345 200 Solar Operational
J968 Not reported 345 200 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first