Reynolds Substation substation interconnection queue
6 active projects totaling 1,400.2 MW in the MISO queue, plus 1 with terminal status (shown grayed).
7 MISO queue filings name Reynolds Substation as the point of interconnection, all in IN.
6active projects
1,400.2active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J2496 | Not reported | 345 | 400 | Battery | Active |
| J837 | Not reported | 345 | 200.1 | Wind | Operational |
| J838 | Not reported | 345 | 200.1 | Wind | Operational |
| G864 | Not reported | n/r | 200 | Wind | Withdrawn |
| J1069 | Not reported | 345 | 200 | Wind | Active |
| J913 | Not reported | 345 | 200 | Solar | Operational |
| J968 | Not reported | 345 | 200 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.