Substation Scout

Keystone Solar

PJM queue ID V4-027

Keystone Solar (V4-027) is listed in the PJM interconnection queue as a 1.9 MW solar project in Lancaster County, PA. The filing names Quarryville as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 30, 2012.

Queue IDV4-027
Project nameKeystone Solar
Status (as published)In Service
SubstationQuarryville
Point of interconnectionQuarryville
CountyLancaster
StatePA
VoltageNot reported
Capacity1.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2012-12-30
Source datasetserial

Same substation and county

Quarryville substation: 3 requests in the PJM queue, 1 active totaling 1.9 MW.

Queue IDProjectMWResourceStatus
B39Quarryville 69kV90GasWithdrawn
AC2-170Keystone Solar1.1SolarWithdrawn

Lancaster, PA: 41 requests in the PJM queue, 8 active totaling 265.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy5
MW capacity1.9
MFO5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first