Keystone Solar
PJM queue ID V4-027
Keystone Solar (V4-027) is listed in the PJM interconnection queue as a 1.9 MW solar project in Lancaster County, PA. The filing names Quarryville as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 30, 2012.
| Queue ID | V4-027 |
|---|---|
| Project name | Keystone Solar |
| Status (as published) | In Service |
| Substation | Quarryville |
| Point of interconnection | Quarryville |
| County | Lancaster |
| State | PA |
| Voltage | Not reported |
| Capacity | 1.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2012-12-30 |
| Source dataset | serial |
Same substation and county
Quarryville substation: 3 requests in the PJM queue, 1 active totaling 1.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| B39 | Quarryville 69kV | 90 | Gas | Withdrawn |
| AC2-170 | Keystone Solar | 1.1 | Solar | Withdrawn |
Lancaster, PA: 41 requests in the PJM queue, 8 active totaling 265.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 5 |
| MW capacity | 1.9 |
| MFO | 5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.