Meadow Lake Wind Farm VI

PJM queue ID AB1-006

Meadow Lake Wind Farm VI (AB1-006) is listed in the PJM interconnection queue as a 26 MW wind project in White County, IN. The filing names Meadow Lake as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2018.

Queue IDAB1-006
Project nameMeadow Lake Wind Farm VI
Status (as published)In Service
SubstationMeadow Lake
Point of interconnectionMeadow Lake 345kV
CountyWhite
StateIN
Voltage345 kV
Capacity26 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2018-12-31
Source datasetserial

Same substation and county

Meadow Lake substation: 11 requests in the PJM queue, 8 active totaling 444.5 MW.

Queue IDProjectMWResourceStatus
C01-1430Meadow Lake 345 kV103.1WindActive
AF1-322Black Prairie Solar Park84SolarUnder Construction
C01-1414Meadow Lake 345 kV84SolarActive
C01-1426Meadow Lake 345 kV53.9WindActive
C01-1428Meadow Lake 345 kV53.5WindActive
AG2-014Meadow Lake 345 kV20BatteryActive
AG2-492Meadow Lake 345 kV20BatteryActive
AI2-098Meadow Lake 345kV107WindWithdrawn
AI2-111Meadow Lake 345 kV84SolarWithdrawn
AG2-491Meadow Lake 345 kV60SolarWithdrawn

White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.

A substation with the same name is named in PJM transmission planning materials: Meadow Lake (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity26
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first