Black Prairie Solar Park

PJM queue ID AF1-322

Black Prairie Solar Park (AF1-322) is listed in the PJM interconnection queue as a 84 MW solar project in White County, IN. The filing names Meadow Lake as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of July 1, 2027.

Queue IDAF1-322
Project nameBlack Prairie Solar Park
Status (as published)Under Construction
SubstationMeadow Lake
Point of interconnectionMeadow Lake 345 kV
CountyWhite
StateIN
Voltage345 kV
Capacity84 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-07-01
Source datasetserial

Same substation and county

Meadow Lake substation: 11 requests in the PJM queue, 8 active totaling 444.5 MW.

Queue IDProjectMWResourceStatus
C01-1430Meadow Lake 345 kV103.1WindActive
C01-1414Meadow Lake 345 kV84SolarActive
C01-1426Meadow Lake 345 kV53.9WindActive
C01-1428Meadow Lake 345 kV53.5WindActive
AB1-006Meadow Lake Wind Farm VI26WindIn Service
AG2-014Meadow Lake 345 kV20BatteryActive
AG2-492Meadow Lake 345 kV20BatteryActive
AI2-098Meadow Lake 345kV107WindWithdrawn
AI2-111Meadow Lake 345 kV84SolarWithdrawn
AG2-491Meadow Lake 345 kV60SolarWithdrawn

White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.

A substation with the same name is named in PJM transmission planning materials: Meadow Lake (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy200
MW capacity84
MFO200

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.