Substation Scout

Meadow Lake 345 kV

PJM queue ID C01-1430

Meadow Lake 345 kV (C01-1430) is listed in the PJM interconnection queue as a 103.1 MW wind project in White County, IN. The filing names Meadow Lake as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 28, 2026.

Queue IDC01-1430
Project nameMeadow Lake 345 kV
Status (as published)Active
SubstationMeadow Lake
Point of interconnectionMeadow Lake 345 kV
CountyWhite
StateIN
Voltage345 kV
Capacity103.1 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2026-04-28
Source datasetcycle

Same substation and county

Meadow Lake substation: 11 requests in the PJM queue, 8 active totaling 444.5 MW.

Queue IDProjectMWResourceStatus
AF1-322Black Prairie Solar Park84SolarUnder Construction
C01-1414Meadow Lake 345 kV84SolarActive
C01-1426Meadow Lake 345 kV53.9WindActive
C01-1428Meadow Lake 345 kV53.5WindActive
AB1-006Meadow Lake Wind Farm VI26WindIn Service
AG2-014Meadow Lake 345 kV20BatteryActive
AG2-492Meadow Lake 345 kV20BatteryActive
AI2-098Meadow Lake 345kV107WindWithdrawn
AI2-111Meadow Lake 345 kV84SolarWithdrawn
AG2-491Meadow Lake 345 kV60SolarWithdrawn

White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.

A substation with the same name is named in PJM transmission planning materials: Meadow Lake (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperMEADOW LAKE WIND FARM LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity103.1
MFO195.0
Submitted date4/27/2026
Last updated10/6/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first