Meadow Lake 345 kV (C01-1430) is listed in the PJM interconnection queue as a 103.1 MW wind project in White County, IN. The filing names Meadow Lake as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 28, 2026.
| Queue ID | C01-1430 |
|---|---|
| Project name | Meadow Lake 345 kV |
| Status (as published) | Active |
| Substation | Meadow Lake |
| Point of interconnection | Meadow Lake 345 kV |
| County | White |
| State | IN |
| Voltage | 345 kV |
| Capacity | 103.1 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2026-04-28 |
| Source dataset | cycle |
Same substation and county
Meadow Lake substation: 11 requests in the PJM queue, 8 active totaling 444.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AF1-322 | Black Prairie Solar Park | 84 | Solar | Under Construction |
| C01-1414 | Meadow Lake 345 kV | 84 | Solar | Active |
| C01-1426 | Meadow Lake 345 kV | 53.9 | Wind | Active |
| C01-1428 | Meadow Lake 345 kV | 53.5 | Wind | Active |
| AB1-006 | Meadow Lake Wind Farm VI | 26 | Wind | In Service |
| AG2-014 | Meadow Lake 345 kV | 20 | Battery | Active |
| AG2-492 | Meadow Lake 345 kV | 20 | Battery | Active |
| AI2-098 | Meadow Lake 345kV | 107 | Wind | Withdrawn |
| AI2-111 | Meadow Lake 345 kV | 84 | Solar | Withdrawn |
| AG2-491 | Meadow Lake 345 kV | 60 | Solar | Withdrawn |
White, IN: 37 requests in the PJM queue, 13 active totaling 770.3 MW.
A substation with the same name is named in PJM transmission planning materials: Meadow Lake (AEP, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | MEADOW LAKE WIND FARM LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 103.1 |
| MFO | 195.0 |
| Submitted date | 4/27/2026 |
| Last updated | 10/6/2026 |