Substation Scout

AES Armenia Mountain Wind, LLC

PJM queue ID V2-019

AES Armenia Mountain Wind, LLC (V2-019) is listed in the PJM interconnection queue as a wind request filed at 0 MW (a net change or energy-only filing) in Bradford County, PA. The filing names Mansfield-S. Troy as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 19, 2010.

Queue IDV2-019
Project nameAES Armenia Mountain Wind, LLC
Status (as published)In Service
SubstationMansfield-S. Troy
Point of interconnectionMansfield-S. Troy 115kV
CountyBradford
StatePA
Voltage115 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2010-08-19
Source datasetserial

Same substation and county

Mansfield-S. Troy substation: 2 requests in the PJM queue, 2 active totaling 20 MW.

Queue IDProjectMWResourceStatus
P47Armenia Mountain WF20WindIn Service

Bradford, PA: 52 requests in the PJM queue, 14 active totaling 913.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0.5
MW capacity0
MFO100.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first