Substation Scout

GR RIDGE ; B substation interconnection queue

2 active projects totalling 42.7 MW in the PJM queue.

2active projects
42.7active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-1177 GR RIDGE ; B 138 kV 138 36.5 Wind Active
C01-1181 GR RIDGE ; B 138 kV 138 6.2 Wind Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.