Grand Ridge WF
PJM queue ID P10
Grand Ridge WF (P10) is listed in the PJM interconnection queue as a 37.2 MW wind project in Lasalle County, IL. The filing names LaSalle as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2013.
| Queue ID | P10 |
|---|---|
| Project name | Grand Ridge WF |
| Status (as published) | In Service |
| Substation | LaSalle |
| Point of interconnection | LaSalle 138kV |
| County | Lasalle |
| State | IL |
| Voltage | 138 kV |
| Capacity | 37.2 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2013-12-01 |
| Source dataset | serial |
Same substation and county
LaSalle substation: 8 requests in the PJM queue, 4 active totaling 584 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1571 | LaSalle 345 kV | 346 | Gas | Active |
| C01-1260 | LaSalle 345 kV | 170.8 | Nuclear | Active |
| N15 | Grand Ridge Energy LLC | 30 | Wind | In Service |
| W1-040 | LaSalle | 350 | Nuclear | Withdrawn |
| Y1-005 | LaSalle | 350 | Nuclear | Withdrawn |
| AI2-178 | LaSalle 138 kV | 36.5 | Wind | Withdrawn |
| AI2-180 | LaSalle 138kV | 6.2 | Wind | Withdrawn |
Lasalle, IL: 27 requests in the PJM queue, 11 active totaling 530.5 MW.
A substation with the same name is named in PJM transmission planning materials: LaSalle (COMED, 4 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 190.5 |
| MW capacity | 37.2 |
| MFO | 190.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.