Ladysmith Combustion Turbine Unit 5 (S102) is listed in the PJM interconnection queue as a 170 MW gas project in Caroline County, VA. The filing names Ladysmith as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2009.
| Queue ID | S102 |
|---|---|
| Project name | Ladysmith Combustion Turbine Unit 5 |
| Status (as published) | In Service |
| Substation | Ladysmith |
| Point of interconnection | Ladysmith 230kV |
| County | Caroline |
| State | VA |
| Voltage | 230 kV |
| Capacity | 170 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2009-03-31 |
| Source dataset | serial |
Same substation and county
Ladysmith substation: 7 requests in the PJM queue, 5 active totaling 510 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| R19 | Ladysmith CT Units 3 & 4 | 340 | Gas | In Service |
| U1-093 | Ladysmith Unit 3 | 0 | Other | In Service |
| U1-094 | Ladysmith Unit 4 | 0 | Other | In Service |
| U1-095 | Ladysmith Unit 5 | 0 | Other | In Service |
| AG2-320 | Ladysmith 230 kV | 105 | Battery | Withdrawn |
| AH1-626 | Ladysmith 230 kV | 62.5 | Battery | Withdrawn |
Caroline, VA: 62 requests in the PJM queue, 14 active totaling 964.7 MW.
A substation with the same name is named in PJM transmission planning materials: Ladysmith (DOM, 7 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 170 |
| MW capacity | 170 |
| MFO | 950 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.