Kelly Creek Wind Farm
PJM queue ID S37
Kelly Creek Wind Farm (S37) is listed in the PJM interconnection queue as a 35 MW wind project in Kankakee County, IL. The filing names Kankakee as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2016.
| Queue ID | S37 |
|---|---|
| Project name | Kelly Creek Wind Farm |
| Status (as published) | In Service |
| Substation | Kankakee |
| Point of interconnection | Kankakee 138kV |
| County | Kankakee |
| State | IL |
| Voltage | 138 kV |
| Capacity | 35 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2016-12-01 |
| Source dataset | serial |
Same substation and county
Kankakee substation: 7 requests in the PJM queue, 2 active totaling 70 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| S36 | Kankakee Wind Farm | 35 | Wind | In Service |
| AI2-076 | Kankakee 138 kV | 56 | Wind | Withdrawn |
| U2-065 | Kankakee 138kV | 32.5 | Wind | Withdrawn |
| AI2-014 | Kankakee 138 kV | 20.5 | Solar | Withdrawn |
| AD1-150 | Kankakee 34.5 kV | 4 | Battery | Withdrawn |
| Q13 | Kankakee 12kV | 1.6 | Gas | Withdrawn |
Kankakee, IL: 42 requests in the PJM queue, 15 active totaling 1,494.4 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 175 |
| MW capacity | 35 |
| MFO | 175 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.