Allegheny Ridge WF1 (N39) is listed in the PJM interconnection queue as a 16 MW wind project in Cambria County, PA. The filing names Johnstown-Altoona as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 15, 2007.

Queue IDN39
Project nameAllegheny Ridge WF1
Status (as published)In Service
SubstationJohnstown-Altoona
Point of interconnectionJohnstown-Altoona 230kV
CountyCambria
StatePA
Voltage230 kV
Capacity16 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2007-03-15
Source datasetserial

Same substation and county

Johnstown-Altoona substation: 3 requests in the PJM queue, 2 active totaling 26 MW.

Queue IDProjectMWResourceStatus
O38North Alleghney WF10WindIn Service
R09Johnstown-Altoona 230 kV9.6WindWithdrawn

Cambria, PA: 46 requests in the PJM queue, 13 active totaling 1,643.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity16
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.